IB Group has completed the preparation and dispatch of P65 long-welded rail destined for Azerbaijan Railways (ADY). The project went beyond supplying material: the rails were processed to the customer's track parameters, welded, tested through automated control systems, and only then loaded onto railway platforms.
Unlike conventional 12.5 and 25 metre rails, long strings sharply reduce the number of joints in the track. Every joint is a source of dynamic impact loading: as the wheel passes over it, additional stress is placed on the rail, on the ballasted bed and on the rolling stock itself. Fewer joints deliver:
Full technical data on profiles, steel grades and length options is set out in the railway tracks section.
A long string is formed by welding individual rails together, and the weld is the most sensitive point of the whole line. The process is therefore controlled stage by stage: the rail ends are prepared, the welding regime is held by an automated control system, the weld zone is ground back to match the geometry of the rail profile, and the integrity of the joint is then verified.
The welding equipment itself is a separate product line for us — mobile and stationary solutions are presented in the railway welding machines section. Where the connection is made mechanically instead, fish plates and railway accessories are used.
In transporting long rail the main risk is not the material but the loading scheme: incorrect support points can leave residual bending in the string. Within this project the rails were lifted by gantry cranes from several points simultaneously, placed on dedicated railway platforms, and strapped and fixed with the full route in mind. This stage forms part of our project management service.
IB Group manages every stage under one line of accountability — from placing the order at mill level through documentation, packing, logistics and handover. The company is the official trade representative of Baogang United Steel and the Aktobe Rail and Beam Plant (ARBZ) across the CIS region, and companies within the group are certified to ISO 9001:2015. Integrated solutions for building railway infrastructure are set out in the railway construction section.